Davis & Shirtliff HO Water Treatment Department under Bernard Rono have successfully implemented, tested and commissioned a large Dayliff Ultrafiltration plant complete with pumping units for Dawat-E-Hadiyah (Saifee Park).
Davis & Shirtliff Garissa under branch manager Wilson Mbuthia, supplied and installed a community water supply system that includes Surface Water pumps with Control Panels fabricated inhouse for Exclusive Builders Limited in Masalani, Garissa County.
Davis & Shirtliff Uganda have supplied and installed a Water treatment plant for Hima Cement C/O the Contractor Optimum Earth. The plant that utilizes Reverse Osmosis technology which purifies over 8,000 litres of Water per hour.
Davis & Shirtliff Isiolo under branch manager Paul Muchiri has solarized a borehole in IWASCO showground, Isiolo town that will supply 17,000l of Water to the residents of Isiolo. The project that is powered by an 11.2kW Solar panel array will greatly reduce the operating cost of the Water pumping system.
Solar pumping is now a proven technology not just for domestic applications but also for large scale industrial systems. Solar pumping systems typically comprises of Solar Panels, an Inverter and Pump. H.E Mutahi Kahiga, governor of Nyeri county has recently commissioned a Solar pumping project that involved retrofitting boreholes with Solar PV systems in Kabati, Nyeri.
Capacity of solution, no of people served, problem faced by customer, benefits of solution to customer.
Recently D&S Engineering completed a unique project at Associated Battery Manufacturers (ABM), Kampala Road, Nairobi. The system involved automation of the factory cooling system by controlling water flow rates, to ensure optimum battery charging temperatures and charging rates for defect free battery production. The cooling system was controlled from a single highly smart control panel that varied flow rates to the various battery tubs intelligently based on different system characteristics.
A leading national polytechnic needed to replace its old generator that ws unreliable and frequently broke down. After inviting bids for the project, the client settled on D&S to provide a standby generator.