D&S undertook a project to supply a Reverse Osmosis (RO) plant i.e. DRO8/4 for use in supply treated water to the UDV/EABL spirit plant at an average rate of 15000 litres per hour. The recovery of the plant was designed at 70% recovery. (Permeate i.e. treated water to the feed water ratio).
Dembe Trading Enterprises located on Jinja road at the outskirts of Kampala, have four manufacturing factories (ice cream, potato wafers (Indian Kurkure), candles and Dairy products. Due to the stringent regulations requiring the treatment of effluent waste water before discharge, Davis & Shirtliff was approached to provide a solution for treating the waste water from their factories to permissible levels that comply with regulation.
Davis & Shirtliff was approached by St. Francis Community Hospital, located in Kasarani Nairobi, to design and install a water treatment plant to treat their borehole water for potable use within their community.
D&S Water treatment/Engineering completed the installation of a 25m3/hr Dayliff Ultrafiltration Plant at the British Army Barracks in Nanyuki. The plant drawing were first approved on paper before moving to site to start the assembly and installation of the plant.
Supply and Installation of standalone Solar Systems in three schools: Tipito Girls Sec Sch (Samburu), ELCK Solion Pri Sch (West Pokot) and Kapkoimet Pri Sch (Baringo).
The number of beneficiaries is approximately 1,200
Capacity of solution, no of people served, problem faced by customer, benefits of solution to customer. This off grid water pumping solution was implemented to supply the areas of Lodwar with water. The power system consists of solarisation of 7 boreholes.
The Project was for solarization of existing boreholse at Bidibid refugee camp. Over 45NO. Boreholes Solarized, with additional RO unit, Pump house and aquatar for water distribution.